PETROSETCO-ALE already performed the following scopes:
Site move and load out Dai Hung 2 topsside 1.340 Te from fabrication yard onto barge by trailer with ballast and mooring operation.
The project was performed completely by PETROSETCO-ALE on 20 May 2011