Lot 1 – Nhon Trach 2 Ccpp Project

Admin 27/08/2025

We received the transformers and generators directly from foreign vessels and transported them via river to the project site.

The transformers and generators were launched and moved close to the machine foundation.

We then lifted the 320-ton generator from the hydraulic trailer to the required height and moved it 15 meters vertically before placing it onto the foundation.