Load In And Site Move For Tien Giang Pvpipe Plant

Admin 27/08/2025

We carried out the following operations:

  • Prepared the barge and temporary supports to receive heavy cargo directly from the vessel onto our barge.

  • Transported the cargo via river from Ho Chi Minh City to PV Pipe Plant in Tiền Giang, unloaded at the dock, and moved the 165-ton machine body to the plant’s equipment storage area.

 