Project Name |
Rang Dong Full Field Development Phase 2 |
Project Scope |
Supply of Material |
Project Description:
- Key Facilities: NCWI and NULQ platform including jackets and topsides and LQ module and 02 bridges, P7 pipeline
- Size: 16” Water Injection Pipeline (P7) – 7.5km
- Weight: NCWI/NULQ decks – 2,500T/ each; NCWI/NULQ jackets – 1,000T/ each; LQ module and helideck – 900T; bridges – 160T/ each
|
|
Client Name |
JAPAN VIETNAM PETROLEUM COMPANY (JVPC)
|