Oil and gas equipment suppliers Vietnam | Petrosetco-pots

Rang Dong Full Field Development Phase 2 - Offshore Installation Project


 

Project Name

Rang Dong Full Field Development Phase 2 

Project Scope

Supply of Material

Project Description:
- Key Facilities: NCWI and NULQ platform including jackets and topsides and LQ module and 02 bridges, P7 pipeline
- Size: 16” Water Injection Pipeline (P7) – 7.5km
- Weight: NCWI/NULQ decks – 2,500T/ each; NCWI/NULQ jackets – 1,000T/ each; LQ module and helideck – 900T; bridges – 160T/ each

Client Name

JAPAN VIETNAM PETROLEUM COMPANY (JVPC)
 
 

 

PETROLEUM OFFSHORE TRADING AND SERVICES JSC.

Address: Room 209-211, 2nd Floor, PetroVietnam Tower, 1-5 Le Duan street, District 1, HCMC, Vietnam

Phone: (+84-28) 3910 6666 - Fax : (+84-28) 3910 6868

Tax Code: 0304 91 8585

Close