Lot 2 – Nhon Trach 2 CCPP Project
We received the Transformer and generator directly from the vessel and transport to site by water way. The transformer and generator was finished load in and site move to close with its foundations. Using skid system to skid the transformer sideway onto a temporary storage area; jacked up, down and positioned at the require […]
See moreProvision of Annual Inspecting Services For SPM & Crude Oil Pipeline System of BSR Project
Scope Of Work: Provision of Annual Inspecting Services (2016) For SPM And Crude Oil Pipeline System of BSR. Client: Binh Son Refining and Petrochemical Company Limited – BSR. Duration: 2016
See moreLoad In And Site Move For Tien Giang Pvpipe Plant
We carried out the following operations: Prepared the barge and temporary supports to receive heavy cargo directly from the vessel onto our barge. Transported the cargo via river from Ho Chi Minh City to PV Pipe Plant in Tiền Giang, unloaded at the dock, and moved the 165-ton machine body to the plant’s equipment storage […]