We carried out the following operations:
-
Prepared the barge and temporary supports to receive heavy cargo directly from the vessel onto our barge.
-
Transported the cargo via river from Ho Chi Minh City to PV Pipe Plant in Tiền Giang, unloaded at the dock, and moved the 165-ton machine body to the plant’s equipment storage area.