Load Out Of Dai Hung 2 Topsside
PETROSETCO-ALE successfully executed the following scope of work:
Transporting and launching the Dai Hung 2 topside, weighing 1,340 tons, from the fabrication yard onto a barge using a specialized hydraulic trailer system, water ballast system, and mooring winch system.
The project was completed on May 20, 2011.

Load Out Of Dai Hung 2 Topsside