Project Name |
THANG LONG – DONG DO WELLHEAD PLATFORM |
Project Scope |
Supply :STRUCTURE STEEL, SUBMERSIBLE PUMPS, CRANE, SHOCKCELL, …
|
Project Description: Thang Long is geographically in the south-weatern part of Block 01/97 & 02/97 in the Cuu Long basin, approximately 120 km east of Vung Tau, 26 Km south of Ruby field and 35 km northeast of Sutuvang field. The oil was discovered by 02/97-TL-1X well (June 2004) in the Lower Miocene and Lower Oligocene sandstone. Dong Do is approximately 5km southeast of Thang Long. The Oil was discovered by 03/97-DD-1X (May 2007). Water depth across block rang from 60 Km to 70 Km. There were total 06 wells drilled in Thang Long – Dong Do field. |
|
Schedule of Project |
2011-2012 |
Client Name |
LAM SON JOC |