Load Out Structure Of Bien Dong 1 Project
Load out Moc Tinh Jacket 6.500 te onto barge by strand jack system with ballast and mooring operation on 27 August 2011.
Load In And Site Move For Tien Giang Pvpipe Plant
Petrosetco - ALE prepared barges, stools for receiving heavy lifts directly from vessel onto barge.
Lot 2 - Nhon Trach 2 CCPP Project
We received the Transformer and generator directly from the vessel and transport to site by water way.