Petrosetco – ALE already performed :
Load out Moc Tinh Jacket 6.500 te onto barge by strand jack system with ballast and mooring operation on 27 August 2011.
Site move and load out Moc Tinh living quarter 600 te onto barge by trailer with ballast and mooring operation on 07 Sep 2011.