PETROSETCO-ALE already performed the following scopes: Site move and load out Dai Hung 2 Jacket 4.500 Te from fabrication yard onto barge by strand jack system with...
Load Out Of Dai Hung 2 Topsside
Site move and load out Dai Hung 2 topsside 1.340 Te from fabrication yard onto barge by trailer with ballast and mooring operation.
Load Out Hai Thach Jacket, Weight 7.300 Te, VSP Port, Vung Tau
PETROSETCO - ALE already performed the load-out jacket Hai Thach 7.300 te from the fabrication yard onto barge by strand jack system with ballast and mooring system on 3...
Load Out Structure Of Bien Dong 1 Project
Site move and load out Moc Tinh topside 3.300 te onto barge by trailer with ballast and mooring operation on 12 Sep 2011.