Petrosetco – ALE already performed :
Site move and load out Moc Tinh topside 3.300 te onto barge by trailer with ballast and mooring operation on 12 Sep 2011.
Site move and load out Moc Tinh pile 2.050 te onto barge by trailer with ballast and mooring operation on 31 Aug for trip 01 and 02 Sep for trip 02.