PETROSETCO-ALE already performed the following scopes: Site move and load out Dai Hung 2 Jacket 4.500 Te from fabrication yard onto barge by strand jack system with ballast and mooring operation. - The project was performed completely by PETROSETCO-ALE on 18 April 2011.